Online Reservation and Instrument Status of CNM/TMI Facilities |
Cancellation Policy:
You can cancel up to 24 hours prior to your scheduled reservation.
Cancellations made within 24 hours will be charged in full. |
Instrument Desciption |
Reservation |
Location |
Status |
Transmission Electron Microscope (TEM)
JEOL 2010F. See Notes Below. |
|
ENS 31N |
Operational |
Electron Beam Lithography (EBL)
Raith 50 |
|
NST 4.106 |
Operational |
Dual Beam System (FIB/SEM)
FEI Strata 235 |
|
NST 3.110 |
Operational |
Atomic Force Microscopy (AFM)
Digital Instrument Dimension 3100 |
|
NST 3.110 |
Operational |
E-beam Evaporator/Sputter
Edward Auto 500 |
|
NST 4.106 |
Operational |
Wire Bonder
Wedge Ultrasonic West Bond 7476D-79 |
|
NST 4.106 |
Operationals |
Probe Station-I and Analyzer
Kari Suss PM 5 |
|
NST 3.110 |
Operational |
Probe Station-II and Analyzer
Karis Suss PM |
|
NST 4.106 |
Operational |
Rapid Thermal Annealer |
|
NST 4.106 |
Shut down for repairs |
Veeco Profilometer |
Open to Trained Users |
NST 4.106 |
Operational |
UV-VIS NIR Spectrometer
Cary 5000 |
|
NST 3.110 |
Operational |
Photolithography |
|
NST 4.106 |
Operational |
Reactive Ion Etcher |
|
NST 4.106 |
Operational |
Thermal Evaporator-II
Denton |
|
NST 4.106 |
Operational |
Ellipsometer |
|
NST 4.106 |
Operational |
Dicing Saw |
|
NST 4.106 |
Contact Mike Tiner before using |
TGA/DSC |
|
NST 2.130 |
Operational |
HPLC/GPC |
|
NST 2.130 |
Shut down for repairs |
FTIR |
|
NST 3.112
|
Operational |
Oxford Deposition |
|
4.106 |
Operational
|
|
p
Cancellation Policy:
You can cancel up to 24 hours prior to your scheduled reservation.
Cancellations made within 24 hours will be charged in full.
|